← All work
Project ManagementLeadershipSharePoint & M365
Leading enterprise intranet projects: 999 (Triple Nine) and Medicinrådet
Project leader and consultant on two concurrent SharePoint intranet engagements, including a 3-country rollout.
Written in English — the working language of most Stockholm engineering teams.
Stack
SharePoint OnlineSolution ArchitectureHybrid Delivery
Problem
999 (Triple Nine) needed a single intranet to centralize a group operating across three countries; Medicinrådet needed a new intranet for 80+ users. Both required translating organizational structure into an information architecture and running delivery with a hybrid team.
My role
- Project leader and consultant, running both engagements concurrently.
- On 999: project leader and consultant in a two-person team, designing the intranet architecture for a group spanning three countries.
- On Medicinrådet: project leader and consultant, setting up SharePoint and designing the intranet architecture for 80+ users.
Approach
- Designed SharePoint intranet architecture for each organization based on its own structure and content needs.
- Led both projects with a hybrid delivery model — coordinating team members and client stakeholders across locations.
- Set up SharePoint sites and governance structure ahead of content migration and rollout.
Outcome
- Running two concurrent project-leader engagements — evidence of managing multiple client relationships and delivery timelines in parallel, not just single-project execution.
- The 999 engagement specifically required designing an architecture that works across three countries' worth of organizational structure — a genuinely cross-border information-architecture problem.